精品国产一级毛片大全,毛片一级在线,毛片免费观看的视频在线,午夜毛片福利

我要投稿 投訴建議

英文合同

時(shí)間:2024-10-28 18:34:51 其他合同范本 我要投稿

有關(guān)英文合同3篇

  在人們愈發(fā)重視契約的社會(huì)中,合同起到的作用越來越大,它也是實(shí)現(xiàn)專業(yè)化合作的紐帶。那么問題來了,到底應(yīng)如何擬定合同呢?以下是小編為大家收集的英文合同3篇,希望對大家有所幫助。

有關(guān)英文合同3篇

英文合同 篇1

  Commercial Contract

  商業(yè)合同

  No:

  合同號:

  Date:

  日 期:

  The Buyer: Zhonghua International Technology Corporation

  賣方:菲爾德·埃米森公司

  The Seller: Field Emission Corp.

  買方:中華國際技術(shù)開發(fā)公司

  This contract is made by and between the Buyer and the Seller, whereby the Buyer agrees to buy and the Seller agrees to sell the under-mentioned commodity according to the terms and conditions stated below:

  根據(jù)本合同條款,買方同意購買,賣方同意出售下述貨品,茲簽訂本合同。

  1. Commodity: camera-control equipment

  1、品名:攝像機(jī)控制設(shè)備

  Quantity: 60 (sets)

  數(shù)量:60(臺(tái))

  Unit price: USD4 800.00

  單價(jià):4 800美元/臺(tái)

  Total amount: USD288 000.00

  總額:288 000美元

  2. Country of origin and manufacturer: Field Emission Corp. in US

  2、原產(chǎn)國別及生產(chǎn)商:美國菲爾德·埃米森公司

  3. Packing

  3、包裝

  To be packed in strong wooden cases or cartons, suitable for long distance ocean, parcel post or air freight transportation as well as changing climate and with good resistance to moisture and shocks.

  用堅(jiān)固的木箱或紙箱包裝,適宜長途海運(yùn)、郵寄或空運(yùn)及適應(yīng)氣候變化,并且具備良好的防潮抗震能力。

  The Seller shall be liable for any damage of the commodity due to improper packing and for any rust attributable to inadequate protective measures in regard to the packing.

  由于包裝不當(dāng)而引起的貨物損壞或由于防護(hù)措施不善而引起貨物銹蝕,賣方應(yīng)賠償由此而造成的全部損失費(fèi)用。

  One full set of service and operation manual shall be enclosed in each case.

  包裝箱內(nèi)應(yīng)附有完整的維修保養(yǎng)、操作使用說明書。

  4. Shipping mark:

  4、運(yùn)輸標(biāo)志

  The Seller shall mark on each package with fadeless paint the package number, gross weight, net weight, measurement and warnings such as “HANDLE WITH CARE”, “KEEP AWAY FROM HEAT”, “KEEP AWAY FROM MOISTURE” as well as shipping mark.

  賣方應(yīng)在每個(gè)貨箱上用不褪色油漆標(biāo)明箱號、毛重、凈重、長、寬、高,并標(biāo)有“小心輕放”,“防潮”及“防熱”等字樣和運(yùn)輸標(biāo)志。

  5. Date of shipment: Aug. 8, 20xx

  5、裝運(yùn)日期:20xx年8月8日

  6. Port of shipment: Los Angeles

  6、裝運(yùn)港:洛杉磯

  7. Port of destination: Ningbo

  7、目的港:寧波

  8. Insurance:

  8、保險(xiǎn)

  To be borne by the Buyer after shipment.

  裝運(yùn)后由買方投保。

  9. Payment, under conditions (1), (2) and (3) below:

  9、支付條件 分以下三種條件支付:

 。1) Through the letter of credit:

  (1)信用證

  The Buyer, on receipt from the Seller of the delivery advice, shall open an irrevocable letter of credit with the Bank of China, in favor of the Seller for the total value of shipment 25 – 30 days prior to the date of delivery. The credit shall be available against Seller‘s draft drawn at sight on the opening bank for 100% invoice value accompanied by the shipping documents specified in Clause 10 hereof. Payment shall be effected by the opening bank by telegraphic transfer against presentation of the aforesaid draft and documents. The letter of credit shall be valid until the 20th day after the shipment is effected.

  買方收到賣方交貨通知,應(yīng)在交貨日期前25 – 30 天,由中國銀行開出以賣方為受益人的與裝運(yùn)金額相同的不可撤銷的信用證。賣方須向開證行出具100%發(fā)票金額即期匯票并附本合同第10款所規(guī)定的裝運(yùn)單據(jù)。開證行收到上述匯票和裝運(yùn)單據(jù)即予以電匯支付。信用證于裝運(yùn)日期后20天內(nèi)有效。

 。2) Collection:

  (2)托收

  The Seller may present the sight draft together with the shipping documents (specified in Clause 10 hereof) through the Seller‘s bank and Buyer’s Bank to the Buyer for collection after shipment.

  貨物裝運(yùn)后, 賣方出具即期匯票,連同本合同第10款規(guī)定的裝運(yùn)單據(jù),通過賣方所在地銀行和買方銀行提交給買方托收。

 。3) By direct remittance:

  (3)直接付款

  Payment shall be effected by the Buyer, by telegraphic transfer, within 7 (seven) days after receipt from the Seller of the shipping documents specified in the Clause 10 hereof.

  買方收到本合同第10款規(guī)定的裝運(yùn)單據(jù)后7天內(nèi), 以電匯向賣方支付貨款。

  10. Documents:

  10、單據(jù)

  (1) In case of sea-freight:

 。1)海運(yùn)

  Full set of clean bills of lading marked “Freight to Collect”, “Freight Prepaid” made out to bank endorsed notifying Zhonghua International Technology Development Corporation at the port of destination.

  全套清潔海運(yùn)提單,標(biāo)明“運(yùn)費(fèi)付訖”,“運(yùn)費(fèi)預(yù)付”,做成空白背書并注明通知目的港的中華國際技術(shù)開發(fā)公司。

 。2) In case of air-freight:

 。2) 空運(yùn)

  One copy of airway bill marked “Freight to Collect”, Freight Prepaid“ and sent to the Buyer.

  空運(yùn)提單副本一份,標(biāo)明“運(yùn)費(fèi)付訖”,“運(yùn)費(fèi)預(yù)付”,寄交買方。

 。3) Invoice in 4 copies indicating contract number and shipping mark, made out in details as per the contract concerned.

 。3)發(fā)票一式4份,標(biāo)明合同號和裝運(yùn)標(biāo)志,發(fā)票根據(jù)有關(guān)合同詳細(xì)填寫。

 。4) Packing list in 2 copies issued by the manufacturer.

 。4)由生產(chǎn)商出具的裝箱單一式兩份。

 。5) Certificate of quality and quantity issued by the manufacturer.

 。5)由生產(chǎn)商出具的質(zhì)量和數(shù)量保證書。

  (6) The Buyer shall be advised by mail/cable immediately after shipment.

 。6)貨物裝運(yùn)后立即用電報(bào)或信件通知買方。

  In addition, the Seller shall, within 10 (ten) days after shipment, send by airmail two sets of aforesaid documents (except item 4) with one set directly to the Buyer and one set directly to Zhonghua International Technology Development Corporation at the port of destination.

  此外,發(fā)貨10天內(nèi),賣方將上述單據(jù)(第5條除外)航寄兩份,一份直接給買方,一份直接給目的港的中華國際開發(fā)公司。

  11. Shipment

  11、裝運(yùn)

 。1) In case of FOB terms

  (1) 離岸價(jià)格條款(FOB條款)

  a. The Seller shall, 30days before the contracted date of shipment, advise the Buyer by cable or letter of the contract number, name of commodity, quality, value, package number, gross weight, measurement and date of readiness at the port of shipment for the Buyer to book shipping space.

  1)賣方于合同規(guī)定的裝運(yùn)日期前30天,用電匯或信件將合同號、品名、數(shù)量、價(jià)值、箱號、毛重、裝箱尺寸和貨物抵裝運(yùn)港日期通知買方,以便買方租船訂艙。

  b. Booking of shipping space shall be arranged by the Buyer‘s shipping agent, China Ocean Shipping Agency.

  2)買方船運(yùn)代理中國外輪代理公司,負(fù)責(zé)辦理租船訂艙事宜。

  c. The Buyer‘s shipping agent (China Ocean Shipping Agency) shall send to the Seller notice indicating the name of vessel, estimated date of loading and contract number for the Seller to arrange shipment 10 (ten) days before the estimated date of arrival of the vessel at the loading port. The Seller is requested to get in close contract with the shipping agent. When it becomes necessary to change the carrying vessel or to advance or delay the arrival date, the Buyer or the shipping agent shall advise the Seller in time. Should the vessel fail to arrive at the loading port within 30 (thirty) days after the arrival date advised by the Buyer, the Buyer shall bear the storage and insurance expenses incurred from the 30 day thereafter.

  3)買方船運(yùn)代理(中國外輪代理公司)預(yù)計(jì)船抵達(dá)裝運(yùn)港10天之前,將船名、預(yù)計(jì)裝貨日期、合同號等通知賣方,以便賣方安排裝運(yùn)。要求賣方與船運(yùn)代理保持密切聯(lián)系。當(dāng)需要更換承運(yùn)船只及船只提前、推遲抵達(dá)時(shí),買方或其船運(yùn)代理應(yīng)及時(shí)通知賣方。如船在買方通知日后30天內(nèi)未能到達(dá),則第30天后倉儲(chǔ)費(fèi)和保險(xiǎn)費(fèi)用由買方承擔(dān)。

  d. The Seller shall be liable for any dead freight or demurrage, should it happen that they have failed to have the commodity ready for loading after the carrying vessel has arrived at the port of shipment on time.

  4)如承運(yùn)船如期抵達(dá)裝運(yùn)港,賣方因備貨未妥而影響裝船,則空艙費(fèi)和滯期費(fèi)均由賣方承擔(dān)。

  e. The Seller shall bear all expenses and risks before the commodity passes over the vessel‘s rail and is released from the tackle. After it has passed over the vessel’s rail and is released from the tackle, all expenses and risks shall be in Buyer‘s account. 5)貨物超過船舷并從吊鉤卸下前,一切費(fèi)用和風(fēng)險(xiǎn)由賣方承擔(dān);貨物超過船舷并從吊鉤卸下,一切費(fèi)用和風(fēng)險(xiǎn)由買方承擔(dān)。

 。2) In case of CFR terms

 。2)成本加運(yùn)費(fèi)價(jià)條款(CFR條款)

  a. The Seller shall ship the goods within the shipment time from the loading port to the port of destination. Transshipment is not allowed.

  1) 在裝運(yùn)期內(nèi),賣方負(fù)責(zé)將貨物從裝運(yùn)港裝運(yùn)至目的港。不得轉(zhuǎn)船。

  b. In case the goods are to be dispatched by air freight, the Seller shall, 30 (thirty) days before the time of delivery as stipulated in Clause 5, inform the Buyer by cable or letter of the estimated date of delivery, contract number, name of commodity, and invoiced value. The Seller shall, immediately after dispatch of the goods, advise the Buyer by cable or letter of the contract number, name of commodity, invoiced value and date of dispatch for the Buyer to arrange the insurance in time.

  2) 貨物空運(yùn)時(shí),賣方于本合同第5條規(guī)定的交貨日期前30天,以電報(bào)或信件把預(yù)計(jì)交貨期合同號、品名、發(fā)票金額等通知買方。發(fā)貨后,賣方立即以電報(bào)或信件將合同號、品名、發(fā)票金額、發(fā)貨日期通知買方,以便買方及時(shí)投保。

  12. Shipping advice

  12、裝運(yùn)通知

  The Seller shall, immediately on the completion of the loading of the goods, advise the Buyer by cable or letter of the contract number, name of commodity, quantity, invoiced value, gross weight, name of vessel and date of sailing. In case the Buyer fails to arrange insurance in time due to the Seller‘s not having cabled in time, all losses shall be borne by the Seller.

  貨物一俟全部裝船,賣方應(yīng)即將合同號、呂名、數(shù)量、發(fā)票金額、毛重、船名及啟航日期用電報(bào)或信件通知買方。如因賣方未能及時(shí)通知致使買方不能及時(shí)投保,賣方則承擔(dān)全部損失。

  13. Guarantee of quality

  13、質(zhì)量保證

  The Seller guarantees that the commodity hereof is made of the best materials with first class workmanship, brand new, unused, and complies with the quality and specifications stipulated in this contract. The guarantee period shall be 12 (twelve) months staring from the date on which the commodity arrives at the port of destination.

  賣方保證:所供貨物由最好的材料及精湛工藝制成,商標(biāo)為新的和未經(jīng)使用的,其質(zhì)量和規(guī)格符合本合同所做的說明。自貨物到達(dá)目的港起12個(gè)月為質(zhì)量保證期。

  14. Claims

  14、索賠

  Except those claims for which the insurance company or the owners of the vessel are liable, should the quality, specifications or quantity be found not in conformity with the stipulations of the contract, within 90 (ninety) days after the arrival of the goods at destination, the Buyer can use the Inspection Certificate issued by China National Import and Export Commodities Inspection Corporation to claim for replacement as compensation. All the expenses incurred (such as inspection charges, freight charges for returning and sending of replacement, insurance premium, storage, loading and unloading charges) shall be borne by the Seller.

  自貨物到達(dá)目的港起90天內(nèi),如發(fā)現(xiàn)貨物質(zhì)量、規(guī)格、數(shù)量與合同規(guī)定不符,除那些應(yīng)由保險(xiǎn)公司或由船方承擔(dān)的部分外,買方可憑中國進(jìn)出口商品檢驗(yàn)總公司出具的商檢證書,有權(quán)要求更換或索賠。

  In regard to quality, the Seller shall guarantee that if, within 12 (twelve) from the date of arrival of the goods at destination, damages occur in the course of operation by reason of inferior quality of material or bad workmanship, the Buyer shall immediately notify the Seller in writing and put forward a certificate issued by the CCIC. The certificate so issued shall be accepted as the base of the claim. The Seller, in accordance with the Buyer‘s claim, shall be responsible for the immediate elimination of the defects, complete or partial replacement of the commodity, or devaluate the commodity according to the state of defects. Where necessary, the Buyer may eliminate the defects themselves at the Seller’s expenses. If the Seller fails to reply within on month after receipt of the aforesaid claim, the claim shall be reckoned as having been accepted by the Seller.

  賣方保證,貨物到達(dá)目的港12個(gè) 月內(nèi),如果使用過程中由于材料質(zhì)量低劣和工藝不佳而出現(xiàn)的損壞,買方立即以書面形式通知賣方并出具中國進(jìn)出口商品檢驗(yàn)總公司開列的`檢驗(yàn)證書,提出索賠。商 檢證書為索賠的依據(jù)。按買方索賠要求,賣方有責(zé)任立即排除貨物的缺陷、全部或部分更換或根據(jù)缺陷情況將貨物作降價(jià)處理。

  15. Force Majeure

  15、不可抗力

  The Seller shall not be held responsible for delay in shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading. The Seller shall advise the Buyer of the occurrence mentioned above within 15 (fifteen) days and send by airmail a certificate of the incident issued by the local government to the Buyer. Even in such cases, the Seller is still liable to take all possible measures to expedite the delivery of goods.

  在貨物制造和裝運(yùn)過程中,由于發(fā)生不可抗力事故致使延期交貨或不能交貨,賣方概不負(fù)責(zé)。賣方在不可抗力事件發(fā)生后,應(yīng)立即通知買方并在事發(fā)14天內(nèi),將事故發(fā)生所在地當(dāng)局簽發(fā)的證書航空郵寄給買方以作證據(jù)。即使在此情況下,賣方仍有責(zé)任采取必要的措施,盡快交貨。

  Should the Seller fails to perform the contracted obligations 10 (ten) weeks after the aforesaid incident, the Buyer shall have the right to treat the contract as null and void.

  不可抗力事故發(fā)生后超過10個(gè)星期而合同尚未履行完畢,買方有權(quán)撤銷合同。

  16. Late delivery and penalty

  16、合同延期和罰款

  Should the Seller fail to make delivery within the contracted period for reasons other than Force Majeure specified in Clause 15 hereof, the Buyer may accept the postponement on condition that the Seller agrees to pay a penalty which shall be deducted by the paying bank from the agreed amount of payment. The penalty, however, shall not exceed 5% (five percent) of the total value of the goods involved in the late delivery. The rate of penalty is charged at 0.55(zero point five percent) for every seven days, odd days less than seven days should be counted as seven days. In case the Seller fails to make delivery ten weeks later than the shipment stipulated in the contract, the Buyer shall have the right to cancel the contract. The Seller, in spite of the cancellation, shall still pay the aforesaid penalty to the Buyer without delay.

  除本合同第15條所述不可抗力原因外,賣方如不能按合同規(guī)定如期交貨,并同意支付罰金,買方可同意延期交貨,付款銀行相應(yīng)減少議定的支付金額,但罰款不得超過遲交貨物總額的5%。賣方如逾期10個(gè)星期仍不能交貨,買方有權(quán)撤銷本合同。盡管合同已撤銷,但賣方仍應(yīng)如期支付上述罰金。

  17. Arbitration

  17、仲裁

  All deputes in connection with this contract or the execution thereof shall be settled through friendly consultations. Should no settlement be reached, the case may then be submitted for arbitration to the Foreign Economic and Trade Arbitration Commission of the CCPIT in accordance with the rules and procedures of the said Arbitration Commission. The arbitration shall take place in 15 (fifteen) days. The decision of the Arbitration Commission shall be final and binding on both Parties. The arbitration fee shall be borne by the losing Party. The arbitration may also be settled in a third country mutually agreed upon by both Parties.

  凡與本合同有關(guān)或因執(zhí)行本合同而發(fā)生的一切糾紛,應(yīng)通過友好協(xié)商解決,如果協(xié)商不能解決,則可提交中國國際貿(mào)易促進(jìn)委員會(huì)對外經(jīng)濟(jì)貿(mào)易仲裁委員會(huì)并根據(jù)該會(huì)仲裁法則和程序進(jìn)行仲裁。仲裁將在15天內(nèi)進(jìn)行,仲裁裁決為最終裁決,對雙方都有約束力。仲裁費(fèi)用由敗訴方承擔(dān)。仲裁也可在雙方都能接受的第三國進(jìn)行。

  18. Special provisions

  18、附加條款

  In witness thereof, this contract is signed by both Parties in two original copies; each Party shall keep one copy.

  本合同一式兩份,雙方簽字劃押,各執(zhí)一份,特此證明。

  The Buyer: Zhonghua International Technology Corporation

  買方:中華國際技術(shù)開發(fā)公司

  The Seller: Field Emission Corp.

  賣方:菲爾德·埃米森公司

英文合同 篇2

  建筑合同 ARCHITECTURE CONFIRMATION

  甲方:Party A: 乙方:Party B:

  合同編號: Contract No

  日期:Date:

  簽約地點(diǎn):Signed at:

  特約定:

  甲方基于下文所列各種因素,特與乙方達(dá)成了協(xié)議并一致同意:由甲方在訂約日期之翌日起_____天之內(nèi)為乙方建造并完成_____(涉約建筑)。涉約建筑之規(guī)模及所需的鋼筋、水泥、磚塊、石子和其它建筑材料之?dāng)?shù)量,均在作為合同附件的'設(shè)計(jì)圖和施工細(xì)則中予以說明。

  Witnesses that the Party A for considerations hereinafter named, contracts and agrees with the Party B that Party A will, within_____ days, next following the date hereof, build and finish a Libarary Building for Party B. ( the building hereinafter is referred to as the said building.) The said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed.

  基于上述情況,乙方及其法定代表鄭重承諾向甲方支付人民幣_(tái)____元整。支付方法商定如下:

  In consideration of the foregoing, Party B shall, for itself and its legal representatives, promise to pay Party A the sum of one million RMB yuan in manner as follows, to wit:

  在上述工程開工之日,支付人民幣_(tái)____元整

  在_____年_____月_____日,支付人民幣_(tái)____元整

  在_____年_____月_____日,支付人民幣_(tái)____元整

  在_____年_____月_____日,支付人民幣_(tái)____元整

  在_____年_____月_____日,支付人民幣_(tái)____元整

  余額人民幣_(tái)____元整于工程完成之日付清。

  RMB_____at the beginning of the said work.

  RMB_____on _____/ _____/_____( for example: 3/21/20xx)

  RMB_____ on_____/ _____/_____

  RMB_____ on_____/ _____/_____

  RMB_____ on_____/ _____/_____

  And the remaining sum will be paid upon the completion of the work.

  訂約雙方并同意由甲方或其法定代表在領(lǐng)取各項(xiàng)付款時(shí),為證明有權(quán)領(lǐng)用上述各次付款(第一次付款除外,因其另有保證),必須由建筑師作出評定,證明已經(jīng)收到的付款之價(jià)值已經(jīng)消耗在勞務(wù)及材料費(fèi)用之中。

  It is further agreed that in order to be entitled to the said payments ( the first one excepted, which is otherwise secured ), Party A or its legal representatives shall, according to the architect's appraisement, have expended, in labor and material, the value of the payments already received by Party A, on the building, at the time of payment.

  上述協(xié)議如未能忠實(shí)執(zhí)行,則違約一方同意其應(yīng)享有權(quán)利自動(dòng)喪失,且在違約之日后一個(gè)月之內(nèi),向?qū)Ψ交蚱浞ǘù碣r償人民幣_(tái)____元整,作為商定之損失賠償費(fèi)。

  For failure to accomplish the faithful performance of the agreement aforesaid, the party so failing agrees to forfeit and pay to the other_____RMB yuan as fixed and settled damages, within one month form the time so failing.

  為示信守,各方謹(jǐn)于上文起首載明之日期簽名、蓋章。

  本合同當(dāng)下列人員之面交付。

  In witness whereof we have hereunto set our hands and seals the day and year first above written.

  Signed, sealed and delivered

  in the presence of

  甲方:Party A : 乙方:Party B:

英文合同 篇3

  Employment Contract

  甲方(用人單位)

  Party A:

  地址:

  法定代表人:

  乙方(勞動(dòng)者)

  Party B:

  身份證號碼:

  ID No:

  住址:

  依照《中華人民共和國勞動(dòng)法》有關(guān)規(guī)定,結(jié)合本公司實(shí)際,甲乙雙方本著平等、自愿、協(xié)商一致的原則達(dá)成如下協(xié)議

  According to the Labor Law of PRC China, Party A and Party B agree as follows:

  一、本合同期限 Contract Period

  本合同期______年__ 月 __日起至______年 ___月___日或本本合同約定終止條件出現(xiàn)時(shí)止。

  This agreement is valid from (Y/M/D) until (Y/M/D) or terminated by either party

  二、工作內(nèi)容和工作時(shí)間 Responsibility & working hours

  1. 甲方聘請乙方擔(dān)任 部門 職務(wù),詳見職務(wù)說明書。

  Party B's Department: Party B's position:

  Please refer to the job description for details.

  2. 乙方須完成甲方安排的生產(chǎn)(工作)任務(wù)

  Party B must accomplish his/her regular work and additional assignments on time

  3. 每天工作8小時(shí),每周工作共40小時(shí)。

  There are 8 working hours a day, 40 working hours a week.

  4. 甲方如因業(yè)務(wù)拓展變化需要對乙方的工作崗位及工作區(qū)域進(jìn)行調(diào)整,乙方應(yīng)當(dāng)接受。如因甲方公司業(yè)務(wù)擴(kuò)展需要或公司合并分立等變更,乙方同意按照法律規(guī)定延續(xù)此本合同,并接受甲方安排,在____(某地區(qū))工作。

  If Party A needed to adjust Party B‘s position and working area for business development variety, Party B should accept it.

  三、工資 Salary

  乙方每月的基本工資:RMB 績效工資:RMB 綜合福利金:RMB ,工資總額為RMB 元(該金額尚未扣除稅金、住房費(fèi)用以及社會(huì)保險(xiǎn)中個(gè)人應(yīng)繳的部份),另甲方予以乙方工資總額7%的住房公積金(如法律規(guī)定住房公積金繳交基數(shù)有上限,則依照法規(guī)執(zhí)行)試用期滿,經(jīng)考核后,根據(jù)考核結(jié)果確定是否正式錄用,正式錄用后薪金保持不變。甲方將視公司的盈利情況和乙方的考核結(jié)果,于每年的三月份進(jìn)行薪金調(diào)整。

  Party B's monthly total revenue (before the deduction of tax, housing fund, social insurance paid by individual) each month would be RMB______ , including base wage RMB______ performance salary RMB_______and social welfare RMB______, And Party A will offer Party B 7% housing fund base on the total revenue, or any upper limit set by the local authority, whichever is the lower. After probation total revenue would be unchanged. Party B's salary will be reviewed annually in March and adjusted in light of Party B's performance and prevailing conditions.

  四、工資的發(fā)放 Payment

  甲方于每月_____日前通過銀行轉(zhuǎn)帳支付發(fā)放上月工資。

  Salary will be paid to Party B's account by T/T before the ____th of the following month.

  五、超時(shí)工作 Over Time

  乙方應(yīng)致力于提高工作效率,按時(shí)完成生產(chǎn)、工作任務(wù)。如因特殊情況需要加班,可自行安排。如乙方希望通過自行安排加班取得加班費(fèi),則乙方必須在加班前四小時(shí)填寫加班申請表呈總經(jīng)理審批。否則,視為無效加班,詳見《員工手冊》。

  Party B must try his best to increase the working efficiency to meet Party A's requirement. If there are special circumstances that Party B has to work overtime, Party B can arrange by themselves. If Party B requests OT payment, he/she must fill in the OT application form and have it approved by GM. OT Application Form without authorized signature is not valid.

  六、加班費(fèi) OT Compensation

  乙方經(jīng)甲方批準(zhǔn)在工作日加班,甲方必須支付給乙方基本工資150%的報(bào)酬;休息日被安排工作而甲方又不能夠給予乙方同等時(shí)間的補(bǔ)休,則甲方須支付給乙方基本工資200%的報(bào)酬;若在國家法定休假日被安排工作,甲方付給乙方基本工資300%的報(bào)酬。

  If Party B works over time and has approved by Party A, he/she will be offered the same period of compensation leave or OT salary according to Labor Law of PRC China.

  七、假期與福利 Holiday & Benefits

  1. 有薪國家法定假日 Statutory Holiday of PRC China with pay

  2. 有薪婚假/產(chǎn)假/喪假 Leave for Marriage, Maternity and Mourning with pay.

  3. 有薪年假 Annual leave with pay

  4. 社會(huì)保險(xiǎn) Social Insurance

  5. 年度獎(jiǎng)金Annual bonus (based on the months worked with party A at the rate of one month‘s wage for each full year worked. )

  詳情請參照《員工手冊》Please refer to Party A's employee manual for detail info.

  八、勞動(dòng)紀(jì)律 Discipline

  乙方應(yīng)嚴(yán)格遵守甲方制定的各項(xiàng)規(guī)章制度和勞動(dòng)紀(jì)律(詳請請參照《員工手冊》執(zhí)行)

  Party B shall strictly obey Party A‘ regulations and discipline. Please refer to Party A's employee manual.

  九、保密協(xié)議 Confidentiality

  乙方需嚴(yán)格保守工作過程中接觸和了解到的公司商業(yè)秘密(包括生產(chǎn)技巧、工藝流程、技術(shù)秘密、管理方法、產(chǎn)銷策略、貨源情報(bào)、設(shè)計(jì)圖紙、成本價(jià)格和客戶資料),否則將受到行政處罰(如無條件解雇、賠償?shù)龋;觸犯刑法的.,甲方將有權(quán)移交司法機(jī)關(guān)處理。乙方調(diào)離甲方,應(yīng)得到甲方同意,并將所有商業(yè)秘密資料移交甲方,同時(shí)承擔(dān)不向外泄露的義務(wù),并保證半年內(nèi)不得利用甲方商業(yè)秘密在生產(chǎn)同類且與甲方有競爭關(guān)系的產(chǎn)品的其他企業(yè)內(nèi)任職。否則,甲方有權(quán)要求乙方賠償因此而帶來的一切經(jīng)濟(jì)損失。

  The recipient shall undertake the obligation to keep confidential, in accordance with the scope and duration agreed upon by both parties, the technical secrets contained in the technology provided by the supplier, which have not been made public.

  十、本合同終止 Termination

  1. 終止本本合同條件 Termination conditions

  A. 試用期間,雙方皆可即時(shí)通知對方解除本本合同;

  During the probation period, either side can terminate the contract by immediate effect.

  B. 試用期滿后,任何一方欲解除本合同,須提前三十日以書面形式通知對方。否則,違約方須向守約方支付違約金(違約金為乙方一個(gè)月的工資),若造成守約方經(jīng)濟(jì)損失的,應(yīng)依法承擔(dān)賠償責(zé)任。

  Either side can terminate the contract by giving 30 days notice in written form after probation period.

  2. 甲方在下列情況下可隨時(shí)直接地通知乙方解除本本合同,無須履行任何法定義務(wù)和手續(xù),無須向乙方補(bǔ)償If any case of the following circumstances, Party A has the right to inform Party B rescission of the contract:

  A. 乙方在試用期間達(dá)不到甲方的要求;Party B‘s performance can’t meet Party A‘s requirement.

  B. 乙方嚴(yán)重失職,給甲方利益造成重大損失的;

  The other party has breached the contract, to the extent that such breach has seriously affected the economic benefits expected when concluding the contract

  C. 違反甲方有關(guān)規(guī)定,應(yīng)予開除的,詳情請參照《員工手冊》執(zhí)行。The condition agreed on in the Party A's employee manual for rescission of the contract has arisen

  3. 乙方在下列情況下終止本本合同不需向甲方補(bǔ)償

  If any one of the following circumstances, Party B has the right of inform Party A rescission of the contract without any compensation:

  A. 被非法限制人身自由的手段強(qiáng)迫勞動(dòng)的;

  Party B is forced to work by illegal means.

  B. 未按本本合同約定支付勞動(dòng)報(bào)酬或勞動(dòng)條件的;

  Party B cannot get the salary or working conditions which agreed in the contract.

  十一、甲、乙雙方須共同遵守國家有關(guān)法規(guī)以及甲方《員工手冊》的有關(guān)規(guī)定。

  Both Party A and Party B shall obey the related regulation of PRC China and Party A's employee manual.

  十二、本本合同自甲方蓋章、乙方簽署之日起生效。

  This contract shall come into effect since both sides sign their names.

  十三、本本合同以中文版本為準(zhǔn),本合同一式二份,甲、乙雙方各執(zhí)一份。

  N.B. In case of divergence, the Chinese texts shall be regarded as authentic. Two originals, one for Party A, the other one for Party B.

  甲、乙雙方簽署同意以上條款The above terms is agreed by:

  甲方(Party A) 簽署日期(Date)

  乙方(Party B) 簽署日期(Date)

【英文合同】相關(guān)文章:

英文合同06-01

【必備】英文合同3篇02-03

英文合同集錦8篇02-03

英文合同集錦10篇04-30

【精華】英文合同三篇04-28

英文合同集錦9篇04-28

【必備】英文合同三篇04-26

英文合同集合五篇04-25

英文合同優(yōu)秀[11篇]07-07

【熱門】英文合同四篇04-26